The project by Park Associati and Snøhetta in Milan combines architecture, landscape and sustainability to transform an existing building into an innovative and accessible urban space. Jendy Joss helped to create the blind portions between the glass cells, using specially designed modular prefab systems with a “C” section for external plant housing.
The installation, carried out with crane and crane, allowed the installation of about 600 modules, covered with waterproof cloth and steel sheet. Jendy Joss’ choice has guaranteed high thermal-acoustic performance and a fast execution.