RESIDENTIAL BUSINESS

Manara Valgimigli School in San Piero in Bagno

2023-09-22T06:30:35+00:00

The proposal for the new school is conceived as a new meeting point for the entire local community. The project is conceived not as a monofunctional building, but as an open site that encourages interaction with the community through its spaces. The school building is designed with respect for the environment and respect for construction. The choice is to give a passive approach which combines innovative technologies that satisfy the criteria of the methods recognized by the sustainability protocols.

The Jendy Joss ModuloJJ dry infill is based on the concept of prefabrication to give a skin to the building. Insulated drywall panels create the external walls which in turn generate thermo-acoustic comfort, while the glass parts are completed with a system of curtains that shield the internal spaces from direct light if necessary and at the same time guarantee the possibility of making the classrooms darkened .

The ModuloJJ walls are designed at a full height of 9m, on the long elevations they include 4 wall holes for the positioning of the fixtures in correspondence with which the ducting for air recirculation has already been pre-installed in the factory. The removal of the scaffolding was not necessary and assembly took place in the space between the structure and the scaffolding, thus allowing subsequent work for the external finishing.

New Residential Towers

2023-09-22T05:59:16+00:00

The 2 Residential Towers designed to guarantee a better quality of life with apartments completely managed by home automation systems, with radiant heating and ducted cooling, all in A4 energy class (the highest possible), with latest generation finishes, spacious and with shaded terraces.

The intervention involves the use of cutting-edge materials and technologies such as the Jendy Joss modular prefabricated solutions chosen for the thermo-acoustic performances offered, the speed of assembly without the need for scaffolding, systems that perfectly integrate with the steel load-bearing structure .

The assembly took place with construction cranes, the cladding is provided with a ventilated polycarbonate fa├žade.