INDUSTRIAL BUSINESS

Manara Valgimigli School in San Piero in Bagno

2023-09-22T06:30:35+00:00

The proposal for the new school is conceived as a new meeting point for the entire local community. The project is conceived not as a monofunctional building, but as an open site that encourages interaction with the community through its spaces. The school building is designed with respect for the environment and respect for construction. The choice is to give a passive approach which combines innovative technologies that satisfy the criteria of the methods recognized by the sustainability protocols.

The Jendy Joss ModuloJJ dry infill is based on the concept of prefabrication to give a skin to the building. Insulated drywall panels create the external walls which in turn generate thermo-acoustic comfort, while the glass parts are completed with a system of curtains that shield the internal spaces from direct light if necessary and at the same time guarantee the possibility of making the classrooms darkened .

The ModuloJJ walls are designed at a full height of 9m, on the long elevations they include 4 wall holes for the positioning of the fixtures in correspondence with which the ducting for air recirculation has already been pre-installed in the factory. The removal of the scaffolding was not necessary and assembly took place in the space between the structure and the scaffolding, thus allowing subsequent work for the external finishing.

Teapak Factory Imola

2022-02-02T10:13:51+00:00

EXTERIOR WALLS AND FACADES

New production plant of TeaPak, an Imola-based company that since 2001, the European headquarters for the mixing, packaging and packaging of herbal teas produced under the Yogi Tea brand, a multinational with headquarters in the United States and Germany, with a development of 12 thousand square meters divided into three areas (production, offices and plant engineering) and external areas for traffic.
The office building has external infill walls with Jendy Joss dry systems in place with technologically advanced solutions and excellent thermo-acoustic performance as well as allowing the maximum construction speed which allows the out-of-water in about 1 month. Aesthetically, aluminum sunscreen solutions and ventilated facades such as Alucobond are provided.